Treevia standard vs market standard: what your money actually buys

The Treevia ALL-IN scope compared line by line with the typical market standard. The hidden extras, the thermal numbers, and what nobody tells you at the offer stage.

Kategoria

Comparison

Czas czytania

12 min

Data publikacji

2026-04-11

Treevia standard vs market standard: what your money actually buys

You sign a contract for a modular house at PLN 700,000. You pay the deposit. Then the foundation turns out to be an extra PLN 30,000, heat-recovery ventilation another 20,000, underfloor heating another 30,000. By the time the invoices stop, you've paid PLN 850,000 - and you still don't have a better house than the one down the road that cost PLN 830,000 with everything already in the price.

This isn't a cautionary tale we made up. It's a pattern common enough in the Polish modular house market that it's worth walking through in detail.

The problem with "price from..."

Most modular house manufacturers quote a price in "basic developer standard." It sounds specific, but in practice it usually means:

  • ❌ No foundation
  • ❌ No heat-recovery ventilation (mechanical ventilation with heat recovery)
  • ❌ No underfloor heating
  • ❌ Often no specific window parameters
  • ❌ No guaranteed U-value

The buyer sees an attractive number, commits, and then the extras start stacking up - typically adding PLN 65,000-90,000 on top of the quoted price.

What's actually inside Treevia's ALL-IN scope?

Take the ALL-IN variant of the BARN 124 model (123.8 m², ground floor + attic) at PLN 873,610 net (~PLN 895,000 gross with 8% VAT). Here's what's already in that number:

Element - Treevia ALL-IN - Market standard

Foundation - ✅ Reinforced concrete slab 28 cm, XPS 200 mm - ❌ Extra cost ~PLN 30,000

Heat recovery - ✅ Ventilation with heat recovery - ❌ Option +PLN 15-25,000

Underfloor heating - ✅ Whole house - ❌ Option +PLN 20-35,000

Architectural project - ✅ Included in ALL-IN - ✅ Often included

Transport - ✅ Up to 100 km included - Varies

Triple-glazed windows - ✅ Uw ≤ 0.9 W/(m²K) - Depends on model

Installation shaft - ✅ 4-6 cm - ❌ None

Structural warranty - ✅ 30 years - Varies - usually 10-15 years

Where the real difference sits: thermal performance

The purchase price is a one-time number. Thermal parameters set your heating bill for the next 30 years.

External wall U-value:

  • Treevia: U = 0.15 W/(m²K) - confirmed by calculations
  • Market standard: ~0.18-0.20 W/(m²K) - right at the WT 2021 limit

That's a 25% difference in heat loss through the wall. For a 120-130 m² house, that translates to an estimated PLN 1,000-2,500 a year less spent heating it. Over 30 years, that's PLN 30,000-75,000 in savings - before accounting for rising energy prices.

Water vapour condensation:

  • Treevia: zero condensation in all layers (ubakus calculations: 90 days, -20°C/80% outside, +22°C inside)
  • Market standard: this data usually isn't published

Phase shift:

  • Treevia: 11 hours - outdoor heat reaches the interior with a multi-hour delay
  • Market standard: manufacturers typically don't quote this parameter

Amplitude damping:

  • Treevia: 17× - a 30°C swing outside becomes ~1.5°C inside
  • Market standard: not published

The wall itself: 295-350 mm of wool vs 180 mm

Wall construction is where the two approaches actually diverge.

Treevia (from outside):

Cladding → 30 mm ventilated gap → Dörken Delta-Vent S+ membrane → 75 mm wool → OSB → 150 mm+ wool (C24) → OSB → 50 mm wool → PE film → OSB → 4-6 cm shaft → plasterboard

Market standard (typical):

Base render → membrane → 180 mm wool → wood-based board → 50 mm wool → wood-based board → PE film → plasterboard

The differences that matter:

  1. Ventilated façade - Treevia has a 30 mm gap protecting the membrane; the market often renders directly onto the membrane
  2. Three insulation layers instead of two - which breaks up thermal bridges
  3. Installation shaft - Treevia lets you service without breaking anything; the market standard runs installations inside the wall itself
  4. Premium membrane - Dörken Delta-Vent S+ vs a standard diffusion membrane

The parameter nobody mentions: summer comfort

With Polish and European summers routinely hitting 35-40°C, keeping cool matters as much as keeping warm.

The 11-hour phase shift in the Treevia wall means the 2:00 pm heat spike reaches your living room around 1:00 am, when it's already cooling off outside. The house buffers itself.

Skipping air conditioning saves real money:

  • AC purchase cost: PLN 8,000-15,000
  • Running cost: PLN 1,000-2,000/year
  • Over 30 years: PLN 38,000-75,000

The market standard rarely publishes phase shift and amplitude damping data - largely because those numbers don't flatter a thinner wall.

The shaft you'll thank yourself for in 20 years

In a standard modular house, wiring and plumbing run inside the structural wall itself. That's fine on day one. But 15-20 years later, when something needs replacing:

  • House without a shaft: break into the wall → damage the insulation → breach the PE film → PLN 20-50,000 and weeks of renovation
  • Treevia house: open the shaft → do the work → close it → a few thousand PLN and a few hours

A pierced vapour barrier never seals as well as the original. Every breach chips away at the wall's thermal performance permanently.

The real cost comparison, ~120 m²

Put concrete numbers side by side:

Treevia BARN 124 ALL-IN: PLN 873,610 net (~PLN 895,000 gross)

  • Foundation ✅
  • Heat recovery ✅
  • Underfloor heating ✅
  • Project ✅
  • Transport up to 100 km ✅
  • U = 0.15, shaft, ventilated façade

Typical market house ~120 m², developer standard: ~PLN 540-650,000 gross

  • \+ foundation: ~PLN 30,000
  • \+ heat recovery: ~PLN 15-25,000
  • \+ underfloor heating: ~PLN 20-35,000
  • = PLN 605-740,000 minimum, and still with worse parameters

Price gap: PLN 155-290,000 in favour of the market-standard house on paper.

But: energy savings of PLN 30-75,000, plus no-AC savings of PLN 38-75,000, plus avoided shaft-renovation costs of PLN 20-50,000, add up to roughly PLN 88-200,000 clawed back over 30 years.

Realistically, the ALL-IN Treevia house costs tens of thousands more up front - and delivers a measurably better quality of life and lower running costs for decades afterward.

What to actually compare

Don't compare "from..." prices. Compare:

  1. What's included - foundation, heat recovery, underfloor heating, transport
  2. Thermal parameters - wall U-value, condensation, phase shift
  3. Wall construction - how many layers, which membrane, whether there's a shaft
  4. The 30-year view - heating costs, servicing installations, façade durability

The market standard meets the code minimum. Treevia beats it by 25% - and that shows up in your heating bill, your summer comfort, and how easy it is to open a wall in 20 years. If you want the ALL-IN quote for your own floor plan, our team can put one together.

Modele, których dotyczy ten tekst